[Quote from the Lagan Aviation site team to follow: one or two sentences on how the job ran.]
Case Studies
A selection of recent work by ABC Surfacing Ltd for main contractors, councils and housebuilders, from plot driveways on a new housing development to a live RAF airfield in Shropshire. Every project was delivered by our Bootle-based team.
Airfield surfacing
Housebuilders
Hand-laid binder course across plot frontages and shared driveways on a new housing development: 60 tonnes down in a single day.
30+ years of surfacing experience
Motorways, runways and residential streets
SMAS Worksafe accredited
Fully insured, documentation for tenders
Trusted by main contractors
Lagan, M&J Evans, Dowhigh, Bethell Group
Based in Bootle
North West as standard, nationwide for airfields
Lagan Aviation needed a surfacing subcontractor for [the runway or taxiway works, to confirm] at RAF Shawbury, a live military training airfield in Shropshire. The surface had to be laid in [closure windows agreed with the base, to confirm] and handed back ready for aircraft, with every shift planned around airside security and access.
We travelled to Shropshire with our own plant and crews and [planed out the existing surface, regulated levels and laid binder and surface courses, to confirm] to the airfield specification. [Add one line on what made the job unusual: the closure windows, the mix, the size of the pours, phasing around flying.]
[X m² of airfield surfaced over X shifts, to confirm] and handed back to Lagan on programme. [Add the result: surface regularity achieved, no defects at inspection, follow-on work with Lagan at Manchester and Edinburgh.]
Logo Aviation
[RAF / MoD, to confirm]
RAF Shawbury, Shropshire
Airfield surfacing [runway, taxiway or apron, to confirm]
[X m², to confirm]
[X shifts, to confirm]
[Planing, binder and surface course, to confirm]
[X] m²
[X] days
[X] bays
ON PROGRAMME
[Quote from the Lagan Aviation site team to follow: one or two sentences on how the job ran.]
M&J Evans were delivering the groundworks and civils on the Moss Nook housing development and needed the binder course laid across a run of plot frontages and shared driveways. The areas sat between new build plots, fencing and kerb lines, with access restricted on all sides, so a paver was not an option. The work had to be done in a day to keep the plots on programme before the next trades moved in.
Our hand-lay gang took the job. Working off the prepared sub-base and kerbs, the team laid and compacted 60 tonnes of 20mm binder course by hand across the plot frontages and driveway areas, to the levels and falls set out for the finished surface. Every edge against the kerbs, fencing and plot thresholds was hand-finished so the surface course ties in cleanly once the plots are complete.
The whole run was down and compacted in a single shift, on one of the hottest days of the year, with deliveries phased so nothing sat on the lorry. M&J Evans had a solid working surface for the rest of the build and the driveways ready for their surface course at handover. [X plots covered, to confirm, and any follow-on phases at Moss Nook.]
M&J Evans
Housebuilders and developers
Moss Nook, [St Helens, to confirm]
Estate roads, footpaths and plot driveways
60 tonnes of 20mm binder course, hand-laid
One shift
July [year, to confirm]
60 tonnes
1 shift
[X] plots
BY HAND
[Quote from the M&J Evans site team to follow: one or two sentences on how the job ran.]