ABC Surfacing Ltd.

Case Studies

Surfacing Projects Across Liverpool, the North West and Beyond

A selection of recent work by ABC Surfacing Ltd for main contractors, councils and housebuilders, from plot driveways on a new housing development to a live RAF airfield in Shropshire. Every project was delivered by our Bootle-based team.

Airfield surfacing

RAF Shawbury, Shropshire

Client: Lagan Aviation
Airfield surfacing on a live RAF training base, delivered as surfacing subcontractor to Lagan Aviation.

Housebuilders

Moss Nook development

Client: M&J Evans

Hand-laid binder course across plot frontages and shared driveways on a new housing development: 60 tonnes down in a single day.

30+ years of surfacing experience

Motorways, runways and residential streets

SMAS Worksafe accredited

Fully insured, documentation for tenders

Trusted by main contractors

Lagan, M&J Evans, Dowhigh, Bethell Group

Based in Bootle

North West as standard, nationwide for airfields

RAF Shawbury, Shropshire

Airfield surfacing for Lagan Aviation on a live RAF training base
Delivered for

The Brief

Lagan Aviation needed a surfacing subcontractor for [the runway or taxiway works, to confirm] at RAF Shawbury, a live military training airfield in Shropshire. The surface had to be laid in [closure windows agreed with the base, to confirm] and handed back ready for aircraft, with every shift planned around airside security and access.

 

What we did

We travelled to Shropshire with our own plant and crews and [planed out the existing surface, regulated levels and laid binder and surface courses, to confirm] to the airfield specification. [Add one line on what made the job unusual: the closure windows, the mix, the size of the pours, phasing around flying.]

 

The outcome

[X m² of airfield surfaced over X shifts, to confirm] and handed back to Lagan on programme. [Add the result: surface regularity achieved, no defects at inspection, follow-on work with Lagan at Manchester and Edinburgh.]

Project details

Client:

Logo Aviation

End client:

[RAF / MoD, to confirm]

Location:

RAF Shawbury, Shropshire

Service:

Airfield surfacing [runway, taxiway or apron, to confirm]

Area laid:

[X m², to confirm]

Programme:

[X shifts, to confirm]

Scope:

[Planing, binder and surface course, to confirm]

[X] m²

of car park surfaced

[X] days

on site, start to handover

[X] bays

marked out and ready to use

ON PROGRAMME

handed back to the client

[Quote from the Lagan Aviation site team to follow: one or two sentences on how the job ran.]

[Name, job title], Lagan Aviation

Moss Nook development

Hand-laid binder course across plot driveways and frontages for M&J Evans
Delivered for

The Brief

M&J Evans were delivering the groundworks and civils on the Moss Nook housing development and needed the binder course laid across a run of plot frontages and shared driveways. The areas sat between new build plots, fencing and kerb lines, with access restricted on all sides, so a paver was not an option. The work had to be done in a day to keep the plots on programme before the next trades moved in.

 

 

What we did

Our hand-lay gang took the job. Working off the prepared sub-base and kerbs, the team laid and compacted 60 tonnes of 20mm binder course by hand across the plot frontages and driveway areas, to the levels and falls set out for the finished surface. Every edge against the kerbs, fencing and plot thresholds was hand-finished so the surface course ties in cleanly once the plots are complete.

 

The outcome

The whole run was down and compacted in a single shift, on one of the hottest days of the year, with deliveries phased so nothing sat on the lorry. M&J Evans had a solid working surface for the rest of the build and the driveways ready for their surface course at handover. [X plots covered, to confirm, and any follow-on phases at Moss Nook.]

Project details

Client:

M&J Evans

End client:

Housebuilders and developers

Location:

Moss Nook, [St Helens, to confirm]

Service:

Estate roads, footpaths and plot driveways

Material:

60 tonnes of 20mm binder course, hand-laid

Programme:

One shift

Completed:

July [year, to confirm]

60 tonnes

of 20mm binder course laid

1 shift

from first delivery to last roll

[X] plots

frontages and driveways covered

BY HAND

in areas too tight for a paver

[Quote from the M&J Evans site team to follow: one or two sentences on how the job ran.]

[Name, job title], M&J Evans