Request A Quote
We remove the worn surface, repair failed base, and lay new binder and surface courses on single and dual carriageway A roads, to the contract specification and the depths it calls for.
Surfacing for dual carriageways, bypasses and other high-speed roads, laid in lane closures and overnight windows so traffic keeps moving while the work goes on. [Confirm night and weekend working]
Resurfacing of junctions, roundabouts, slip roads and merge lanes, where braking and turning traffic wears the surface fastest. We lay high-performance mixes such as stone mastic asphalt where the specification calls for them.
Planned resurfacing, inlays, overlays and patch repairs delivered through main contractors on council and highway authority maintenance programmes, from a single stretch to a season of schemes.
Highway work comes to us through main contractors delivering programmes for local highway authorities, such as Dowhigh and Lagan, who need a surfacing subcontractor with the plant and the experience for busy, high-speed roads. We also work with councils and civil engineering contractors on junction improvements, bypasses and new link roads.







The team behind ABC Surfacing has laid motorways and trunk roads in the UK, Ireland and Australia, including the M50, M1, M2 and M7 and the Bruce Highway. That experience sets the standard for every highway we take on.
We source from Breedon, Cemex and Holcim and lay the mix the specification calls for, from hot rolled asphalt and asphalt concrete to stone mastic asphalt such as Breedon’s Viadrive SMA.
We plan the work around lane closures, overnight windows and weekend possessions, and coordinate with the traffic management on site so the road is handed back on time.
We hold SMAS Worksafe accreditation and full insurance, with the documentation main contractors and highway authorities need for supplier approval.
We survey the existing carriageway, the drainage and ironwork, and the traffic management the works will need, then quote against the specification.
We survey the existing carriageway, the drainage and ironwork, and the traffic management the works will need, then quote against the specification.
Planing out the old surface to the specified depth, repairing failed areas of base, regulating levels and adjusting ironwork.
Binder and surface courses laid and compacted to depth, level and ride quality, in the closures and shifts agreed with the main contractor.
Joints sealed, ironwork checked, carriageway swept and handed back for reopening, with line marking arranged where required.
We are based in Bootle and cover:
We cover airports and airfields across the UK from our base in Bootle, with recent projects at Manchester Airport, Edinburgh Airport and RAF Shawbury in Shropshire. For all other surfacing we work within about two hours of Bootle.
We treat highways as the faster, busier roads: A roads, trunk roads, dual carriageways and bypasses. They need thicker build-ups, higher performance mixes and work planned around traffic management. Residential streets, estate roads and private roads are covered on our road surfacing page.
Yes. Most highway resurfacing is done in overnight closures or weekend possessions, and we plan our shifts around the windows the highway authority allows.
We work within the traffic management arranged by the main contractor or highway authority, and plan our work to fit the closures they put in place. [Confirm whether ABC ever arranges traffic management itself]
Whatever the specification calls for. On high-speed roads that is often a stone mastic asphalt such as Viadrive SMA, with hot rolled asphalt or asphalt concrete where specified.
Yes. We work regularly as surfacing subcontractor to main contractors including Dowhigh, Lagan, MV Kelly and Bethell Group.
Call 07531 447324, email abcsurfacing@gmail.com or use the form, and we will come back to you with a free quote.